CAD Geometry Review
Reviewing geometry and navigating the engineering workspace in VectorCraft.
Software development / In progress
Engineering, production and business tools built around practical workflows. Explore our software projects, from CAD and CAM to training, invoicing and timekeeping.
A multi-discipline engineering workspace with independent modules for civil engineering, mechanical design engineering, and SparkPath, a wire EDM programming CAM module. It is designed around separate projects, retained sessions, drawing workflows, constraints, inspection, and exact engineering control.
Recorded snippets
Civil drafting and engineering workflows from the current development build.
Reviewing geometry and navigating the engineering workspace in VectorCraft.
Working with drawing tools and inspecting geometry from different views.
The production platform currently shown in the prototype as Injection Manager. VectorOps is the proposed name for this production operations and ERP platform for injection manufacturing. The software brings machine queues, active orders, live planning, toolshop repairs, active tasks, general export, archive, master data, technical data, and performance reporting into one workspace.
A visual environment for introducing new employees to the injection cycle and testing process scenarios. Follow filling, holding, cooling and recovery alongside pressure and screw-position curves.
Illustrative engineering estimates for training and testing. Validate against material data and measured machine behaviour before production use.
Project & invoice management
Connect projects, customers, offers, orders and invoices in one workspace. Review work status, outstanding payments and team payouts with EUR and RON reporting.
Demonstration data. Customer details, project references and financial values have been replaced for this presentation.
Timekeeping & workforce administration
Bring clock-in records, attendance, shift planning and monthly payroll preparation together. Follow daily staffing, review working time and prepare reports from one organised workspace.
Demonstration data only. Employee identities and salary values are fictional; payroll settings require validation before operational use.